Skip to content

Merge pull request #45781 from neersighted/c8d_stargz_refcount #219

Merge pull request #45781 from neersighted/c8d_stargz_refcount

Merge pull request #45781 from neersighted/c8d_stargz_refcount #219

Triggered via push June 21, 2023 14:55
Status Failure
Total duration 2h 8m 3s
Artifacts 4
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

test.yml

on: push
validate-dco  /  run
38s
validate-dco / run
Matrix: build-dev
integration-cli-prepare
24s
integration-cli-prepare
prepare-smoke
8s
prepare-smoke
validate-prepare
6s
validate-prepare
Matrix: integration
Matrix: integration-cli
Matrix: smoke
Matrix: validate
integration-report
53s
integration-report
unit-report
21s
unit-report
integration-cli-report
41s
integration-cli-report
Fit to window
Zoom out
Zoom in

Annotations

2 errors
integration-cli (DockerSwarmSuite)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 120 minutes.
integration-cli (DockerSwarmSuite)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
docker-py-reports Expired
3.54 MB
integration-cli-reports Expired
41.8 MB
integration-reports Expired
53.4 MB
unit-reports Expired
6.98 MB