Skip to content

Bump jinja2 from 3.1.2 to 3.1.6 #1446

Bump jinja2 from 3.1.2 to 3.1.6

Bump jinja2 from 3.1.2 to 3.1.6 #1446

Triggered via push May 4, 2025 12:36
Status Failure
Total duration 2h 23m 55s
Artifacts

python.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.8)
Process completed with exit code 143.
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_8" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_8" failed
build (3.11)
The strategy configuration was canceled because "build._3_8" failed