Showing 1 changed file with 24 additions and 5 deletions.
29 changes: 24 additions & 5 deletions dist/diagrams/mathaven.md
Original file line number Diff line number Diff line change
Expand Up @@ -98,17 +98,17 @@ $$
ẏ_C = ẏ_G + θ̇_x R
$$

#### Equation (15a): Rolling condition for the ball at the cushion (when slip speed \( s = 0 \))
#### Equation (15a): Rolling condition for the ball at the cushion (when slip speed $s = 0$
$$
\Delta P_I^x = 0, \quad \Delta P_I^{y'} = 0
$$

#### Equation (15b): Rolling condition for the ball at the table (when slip speed \( s' = 0 \))
#### Equation (15b): Rolling condition for the ball at the table when slip speed $s' = 0$
$$
\Delta P_C^x = 0, \quad \Delta P_C^y = 0
$$

#### Equation (16a): Work done by the normal force at contact point \( I \) along the \( Z' \)-axis
#### Equation (16a): Work done by the normal force at contact point $I$ along the $Z'$-axis

$$
(W_{Z'}^I)_{n+1}-(W_Z'^I)_n = \Delta P_I \cdot \frac{(ż'_I)_n + (ż'_I)_m}{2}
Expand Down Expand Up @@ -146,7 +146,7 @@ This section outlines the numerical scheme used to simulate the motion of a bill
- The algorithm includes logic to adjust calculations if a rolling condition (no-slip state) is reached at either the cushion or table contacts, as defined by Equations (15a) and (15b).

5. **Work Done Calculation**:
- Work done by the normal force at the contact point \( I \) along the \( Z' \)-axis is calculated using Equation (16a) and stored for analysis
- Work done by the normal force at the contact point $I$ along the $Z'$-axis is calculated using Equation (16a) and stored for analysis


This iterative algorithm captures the changes in the ball’s velocity and spin during impact, with stored values enabling further analysis of trajectory variations due to friction and cushion effects.
Expand All @@ -173,6 +173,23 @@ In order to start the numerical scheme, a reasonable value for $\Delta P_I$ has

Hence, approximately for $N$ iterations, $\Delta P_I = \frac{(1 + e_e) M V_0 \sin \alpha}{N}$. Obviously, the values of $P_I^c$ and $P_I^f$ will determine the actual number of iterations that take place in the scheme. An initial $N$ of 5000 worked satisfactorily for the scheme.

The paper outlines an algorithm for compression phase while $ẏ_G < 0$

1. **CHECK FOR** $s, \Phi, s', \Phi'$
**ESTIMATE** $\Delta \dot{x}_G, \ldots, \Delta \dot{\theta}_z$
*(Use Eqns. 15 and 17)*

2. $\dot{x}_G = \dot{x}_G + \Delta \dot{x}_G$
$\dot{\theta}_z = \dot{\theta}_z + \Delta \dot{\theta}_z$

3. **UPDATE** $s, \Phi, s', \Phi'$
*(Use Eqns. 12 and 13)*

4. **UPDATE**
$\dot{X}_G , \ldots, \dot{\theta}_z$

5. **ESTIMATE** $\Delta W^z$ *(Use Eqn. 16a)* $W^z = W^z + \Delta W^z$

**References:**

- A theoretical analysis of billiard ball
Expand Down Expand Up @@ -234,8 +251,10 @@ class CompressionPhase {
this.setInitialConditions(initial);
}

... complete this class ...
public completeCompressionPhase() : State
... complete this class for compression phase only ...
}

```

0 comments on commit cc543c8