Skip to content

Shepherd-1 Feature parity

Past due by over 2 years 63% complete

This is the point where everything which shepherd-1 does can be done by shepherd-2 and we reach feature parity. This is our MVP. To ship in brain3 we need to have this done by the start of september. Including testing.

Loading