Skip to content

Graceful shutdown

Graceful shutdown #66

Triggered via pull request March 26, 2024 08:26
Status Failure
Total duration 16m 11s
Artifacts

test-external.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
3.0 on ubuntu
The action 'Run tests' has timed out after 10 minutes.
3.1 on ubuntu
The job was canceled because "ubuntu_3_0" failed.
3.1 on ubuntu
The action 'Run tests' has timed out after 10 minutes.
3.2 on ubuntu
The job was canceled because "ubuntu_3_0" failed.
3.2 on ubuntu
The operation was canceled.
3.3 on ubuntu
The job was canceled because "ubuntu_3_0" failed.
3.3 on ubuntu
The operation was canceled.
3.1 on macos
The job was canceled because "ubuntu_3_0" failed.
3.1 on macos
The operation was canceled.
3.2 on macos
The job was canceled because "ubuntu_3_0" failed.
3.2 on macos
The operation was canceled.
3.0 on macos
The job was canceled because "ubuntu_3_0" failed.
3.0 on macos
The operation was canceled.
3.3 on macos
The job was canceled because "ubuntu_3_0" failed.
3.3 on macos
The operation was canceled.