Skip to content

Refactor CI

Refactor CI #7

Triggered via pull request December 13, 2023 13:49
Status Cancelled
Total duration 13m 55s
Artifacts 2

rust.yml

on: pull_request
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Build aarch64-unknown-linux-musl
Process completed with exit code 101.
test (windows-latest)
Canceling since a higher priority waiting request for 'CI-refs/pull/408/merge' exists
test (windows-latest)
The operation was canceled.
Build x86_64-pc-windows-msvc
Canceling since a higher priority waiting request for 'CI-refs/pull/408/merge' exists
Build x86_64-pc-windows-msvc
The operation was canceled.
Build x86_64-pc-windows-gnu
Canceling since a higher priority waiting request for 'CI-refs/pull/408/merge' exists
Build x86_64-pc-windows-gnu
The operation was canceled.
Build x86_64-apple-darwin
Canceling since a higher priority waiting request for 'CI-refs/pull/408/merge' exists
Build x86_64-apple-darwin
The operation was canceled.

Artifacts

Produced during runtime
Name Size
rattler-build-v0.6.0-aarch64-apple-darwin.tar.gz Expired
18.1 MB
rattler-build-v0.6.0-x86_64-unknown-linux-musl.tar.gz Expired
32.4 MB