Skip to content

Upgrade bech32 depenendency, bech32 serialization improvements #296

Upgrade bech32 depenendency, bech32 serialization improvements

Upgrade bech32 depenendency, bech32 serialization improvements #296

Triggered via push September 11, 2024 20:38
Status Failure
Total duration 6h 0m 40s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
rustfmt
Process completed with exit code 1.
linting
Process completed with exit code 101.
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
incremental-mutants
The operation was canceled.
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
build (windows-latest, 1.63.0)
The operation was canceled.