Skip to content

introduce code coverage analysis in CI #518

introduce code coverage analysis in CI

introduce code coverage analysis in CI #518

Triggered via pull request November 16, 2023 12:30
Status Cancelled
Total duration 8m 0s
Billable time 41m
Artifacts 1

ci.yml

on: pull_request
Protobuf Backward Compatibility
9s
Protobuf Backward Compatibility
Sanity Checks
4m 9s
Sanity Checks
Style
34s
Style
RPC Schema
6m 27s
RPC Schema
Matrix: cargo_nextest
Backward Compatibility
1m 53s
Backward Compatibility
Database Migration
1m 33s
Database Migration
Genesis Changes
52s
Genesis Changes
Upgradability
2m 11s
Upgradability
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Database Migration
Process completed with exit code 1.
Backward Compatibility
Process completed with exit code 1.
Upgradability
Process completed with exit code 1.
Cargo Nextest (Linux)
Canceling since a higher priority waiting request for 'CI-refs/pull/10180/merge' exists
Cargo Nextest (Linux)
The operation was canceled.
Cargo Nextest (Linux Nightly)
Canceling since a higher priority waiting request for 'CI-refs/pull/10180/merge' exists
Cargo Nextest (Linux Nightly)
The operation was canceled.
Cargo Nextest (MacOS)
Canceling since a higher priority waiting request for 'CI-refs/pull/10180/merge' exists
Cargo Nextest (MacOS)
The operation was canceled.
Protobuf Backward Compatibility
No github_token supplied, API requests will be subject to stricter rate limiting

Artifacts

Produced during runtime
Name Size
neard Expired
174 MB