Skip to content

Merge pull request #442 from tnull/2025-01-invoice-desc-followup #1305

Merge pull request #442 from tnull/2025-01-invoice-desc-followup

Merge pull request #442 from tnull/2025-01-invoice-desc-followup #1305

Triggered via push January 24, 2025 08:38
Status Failure
Total duration 6h 0m 26s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 1 warning
build (ubuntu-latest, 1.75.0)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, 1.75.0)
The operation was canceled.
build (macos-latest, stable)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
build (macos-latest, stable)
The operation was canceled.
build (ubuntu-latest, stable)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
build (macos-latest, beta)
The operation was canceled.
build (ubuntu-latest, beta)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636