Skip to content

chore: update Go, CI, and linter #13

chore: update Go, CI, and linter

chore: update Go, CI, and linter #13

Triggered via push October 31, 2023 10:25
Status Failure
Total duration 46s
Artifacts

go-cross.yml

on: push
Matrix: Go
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Go (stable, ubuntu-latest)
Process completed with exit code 1.
Go (oldstable, macos-latest)
The job was canceled because "stable_ubuntu-latest" failed.
Go (oldstable, macos-latest)
The operation was canceled.
Go (stable, windows-latest)
The job was canceled because "stable_ubuntu-latest" failed.
Go (stable, windows-latest)
The operation was canceled.
Go (stable, macos-latest)
The job was canceled because "stable_ubuntu-latest" failed.
Go (stable, macos-latest)
The operation was canceled.
Go (oldstable, windows-latest)
The job was canceled because "stable_ubuntu-latest" failed.
Go (oldstable, windows-latest)
The operation was canceled.
Go (oldstable, ubuntu-latest)
The job was canceled because "stable_ubuntu-latest" failed.
Go (oldstable, ubuntu-latest)
The operation was canceled.