Skip to content

build(deps): bump google.golang.org/protobuf from 1.36.3 to 1.36.4 #14912

build(deps): bump google.golang.org/protobuf from 1.36.3 to 1.36.4

build(deps): bump google.golang.org/protobuf from 1.36.3 to 1.36.4 #14912

Triggered via pull request January 24, 2025 15:45
Status Cancelled
Total duration 42m 11s
Artifacts 2

build-x86-image.yaml

on: pull_request
Build E2E Binaries
4m 27s
Network Policy Path Filter
0s
Build kube-ovn-base
4s
Build kube-ovn-dpdk-base
4s
Build vpc-nat-gateway
59s
Matrix: Kubernetes Network Policy E2E
Matrix: Cilium Chaining E2E
Matrix: Kubernetes Conformance E2E
Matrix: Kube-OVN Conformance E2E
Matrix: Kube-OVN HA E2E
Matrix: Kube-OVN IC Conformance E2E
Matrix: Multus Conformance E2E
Matrix: VPC Egress Gateway E2E
LB Service E2E
5m 2s
Iptables VPC NAT Gateway E2E
8m 36s
Matrix: Cyclonus Network Policy E2E
Matrix: Chart Installation/Uninstallation Test
Underlay Logical Gateway Installation Test
4m 7s
Disable OVN LB Test
3m 22s
Disable Network Policy Test
4m 15s
Installation Compatibility Test
5m 9s
Kube-OVN Submariner Conformance E2E
12m 39s
Matrix: Kube-OVN Connectivity E2E
Push Images
0s

Annotations

12 errors
Kube-OVN Conformance E2E (ipv6, overlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (ipv6, overlay)
The operation was canceled.
Kube-OVN Conformance E2E (ipv6, underlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (ipv6, underlay)
The operation was canceled.
Kube-OVN Conformance E2E (dual, underlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (dual, underlay)
The operation was canceled.
Kube-OVN Conformance E2E (dual, overlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (dual, overlay)
The operation was canceled.
Kube-OVN Conformance E2E (ipv4, underlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (ipv4, underlay)
The operation was canceled.
Kube-OVN Conformance E2E (ipv4, overlay)
Canceling since a higher priority waiting request for 'Build x86 Image-refs/pull/4947/merge' exists
Kube-OVN Conformance E2E (ipv4, overlay)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
kube-ovn
603 MB
vpc-nat-gateway
9.49 MB