Skip to content

Merge pull request #90 from jtc42/dependabot/pip/ruff-gte-0.5.1-and-l… #620

Merge pull request #90 from jtc42/dependabot/pip/ruff-gte-0.5.1-and-l…

Merge pull request #90 from jtc42/dependabot/pip/ruff-gte-0.5.1-and-l… #620

Triggered via push November 9, 2024 15:15
Status Failure
Total duration 2m 15s
Artifacts

main.yml

on: push
Matrix: test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.11)
Process completed with exit code 255.
test (3.9)
The job was canceled because "_3_11" failed.
test (3.9)
The operation was canceled.
test (3.10)
The job was canceled because "_3_11" failed.
test (3.10)
The operation was canceled.
test (3.8)
The job was canceled because "_3_11" failed.
test (3.8)
The operation was canceled.
test (3.12)
The job was canceled because "_3_11" failed.
test (3.12)
The operation was canceled.