Skip to content
This repository has been archived by the owner on Oct 25, 2024. It is now read-only.

[LLM Runtime] refactor itrex backend based on the latest Jblas #1924

[LLM Runtime] refactor itrex backend based on the latest Jblas

[LLM Runtime] refactor itrex backend based on the latest Jblas #1924

Re-run triggered December 12, 2023 14:27
Status Failure
Total duration 55m 32s
Artifacts 1

unit-test-neuralchat.yml

on: pull_request
Matrix: unit-test
Generate-Report
0s
Generate-Report
Fit to window
Zoom out
Zoom in

Annotations

3 errors
unit-test (refs/pull/769/merge, PR-test)
Process completed with exit code 1.
unit-test (main, baseline)
The job was canceled because "refs_pull_769_merge_PR-te" failed.
unit-test (main, baseline)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
UnitTestPR-test Expired
8.91 MB