build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #441
Annotations
5 errors and 6 warnings
Test on go 1.19
Docker build failed with exit code 1
|
Test on go 1.20
The job was canceled because "_1_19" failed.
|
Test on go 1.20
The operation was canceled.
|
Test on go 1.18
The job was canceled because "_1_19" failed.
|
Test on go 1.18
The operation was canceled.
|
Test on go 1.19
Docker build failed with exit code 1, back off 2.783 seconds before retry.
|
Test on go 1.19
Docker build failed with exit code 1, back off 2.602 seconds before retry.
|
Test on go 1.20
Docker build failed with exit code 1, back off 3.651 seconds before retry.
|
Test on go 1.20
Docker build failed with exit code 1, back off 5.485 seconds before retry.
|
Test on go 1.18
Docker build failed with exit code 1, back off 7.78 seconds before retry.
|
Test on go 1.18
Docker build failed with exit code 1, back off 2.777 seconds before retry.
|