[tomlib] Update to 1.2.11 #1925
pull-request.yml
on: pull_request
Detect affected packages
32s
Matrix: master / test-package
Matrix: 4.12.1 / test-package
4.12.1
/
Generate report
11s
Create or update PR comment
6s
Annotations
4 errors
master / Build GAP and packages
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
master / Build GAP and packages
The operation was canceled.
|
4.12.1 / Build GAP and packages
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
4.12.1 / Build GAP and packages
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
report-4.12.1
Expired
|
94.8 KB |
|
report-master
Expired
|
94.8 KB |
|