Skip to content

Download ledger.did from new path #31874

Download ledger.did from new path

Download ledger.did from new path #31874

Triggered via push October 15, 2024 13:51
Status Cancelled
Total duration 1m 53s
Billable time 2m
Artifacts

checks.yml

on: push
Matrix: small-tests
formatting
1m 29s
formatting
spelling
1m 29s
spelling
cargo-tests
1m 29s
cargo-tests
svelte-tests
1m 31s
svelte-tests
svelte-lint
1m 28s
svelte-lint
ShellCheck
22s
ShellCheck
IC Commit
22s
IC Commit
Release template
1m 28s
Release template
Config is as expected
34s
Config is as expected
Migration test utilities work
16s
Migration test utilities work
minor-version-bump-works
1m 28s
minor-version-bump-works
The nns-dapp npm and cargo versions should match
56s
The nns-dapp npm and cargo versions should match
Can get NNS proposal args
0s
Can get NNS proposal args
checks-pass
6s
checks-pass
Fit to window
Zoom out
Zoom in

Annotations

20 errors
IC Commit
Process completed with exit code 22.
small-tests (ubuntu-20.04)
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
small-tests (ubuntu-20.04)
The operation was canceled.
svelte-lint
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
svelte-lint
The operation was canceled.
formatting
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
formatting
The operation was canceled.
minor-version-bump-works
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
minor-version-bump-works
The operation was canceled.
svelte-tests
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
svelte-tests
The operation was canceled.
Release template
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
Release template
The operation was canceled.
cargo-tests
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
cargo-tests
The operation was canceled.
small-tests (macos-13)
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
small-tests (macos-13)
The operation was canceled.
spelling
Canceling since a higher priority waiting request for 'Unit Tests-refs/heads/kloet/fix-update-ic' exists
spelling
The operation was canceled.
checks-pass
Process completed with exit code 1.