Skip to content

Tests

Tests #464

Triggered via schedule August 15, 2024 01:18
Status Failure
Total duration 3m 37s
Billable time 6m
Artifacts 1

ci.yaml

on: schedule
Build charm  /  Collect bases for charm | .
13s
Build charm / Collect bases for charm | .
Lint  /  Lint .github/workflows/
3s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
13s
Lint / tox run -e lint
Check libraries
27s
Check libraries
Matrix: Build charm / build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
Build charm / Build charm | base #0
Process completed with exit code 1.
Build charm / Build charm | base #2
The job was canceled because "_0_ubuntu-latest" failed.
Build charm / Build charm | base #2
The operation was canceled.
Build charm / Build charm | base #3
The job was canceled because "_0_ubuntu-latest" failed.
Build charm / Build charm | base #3
The operation was canceled.
Build charm / Build charm | base #1
The job was canceled because "_0_ubuntu-latest" failed.
Build charm / Build charm | base #1
The operation was canceled.
Check libraries
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, canonical/charming-actions/check-libraries@2.3.0. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.

Artifacts

Produced during runtime
Name Size
logs-charmcraft-build-packed-charm-cache-true-.-base-0
9.54 KB