Skip to content

test fiber: remove timestamps #320

test fiber: remove timestamps

test fiber: remove timestamps #320

Triggered via push April 2, 2024 16:25
Status Failure
Total duration 6m 50s
Artifacts

main.yml

on: push
Matrix: build-compat
Matrix: format
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
build (ubuntu-latest, 5.1)
Process completed with exit code 1.
build (ubuntu-latest, 4.14)
The job was canceled because "ubuntu-latest_5_1" failed.
build (ubuntu-latest, 4.14)
The operation was canceled.
build (ubuntu-latest, 4.08)
The job was canceled because "ubuntu-latest_5_1" failed.
build (ubuntu-latest, 4.08)
The operation was canceled.
build-compat (macos-latest, 5.1)
Process completed with exit code 1.
build-compat (macos-latest, 5.1)
darcs has been deprecated because it depends on GHC 8.10 to build!