Skip to content

ci: switch to Github Actions #4

ci: switch to Github Actions

ci: switch to Github Actions #4

Triggered via pull request September 15, 2024 17:09
Status Failure
Total duration 51s
Artifacts

rubygems.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.1)
The process '/home/runner/work/fastlane-plugin-google_drive/fastlane-plugin-google_drive/cc-reporter' failed with exit code 255
test (3.1)
🚨 CC Reporter after-build checkin failed!
test (2.7)
The job was canceled because "_3_1" failed.
test (2.7)
The operation was canceled.
test (2.6)
The job was canceled because "_3_1" failed.
test (2.6)
The operation was canceled.
test (3.0)
The job was canceled because "_3_1" failed.
test (3.0)
The operation was canceled.