Lint #16069
build-test.yml
on: push
Prepare build environment
45s
Build all the Docker containers and push them to Docker Hub
6m 0s
Matrix: E2E tests
All tests passed
0s
Annotations
7 errors
E2E tests (admin)
Process completed with exit code 127.
|
E2E tests (node)
Process completed with exit code 127.
|
E2E tests (utilities)
The job was canceled because "node" failed.
|
E2E tests (utilities)
Process completed with exit code 127.
|
E2E tests (validator)
The job was canceled because "node" failed.
|
E2E tests (validator)
Process completed with exit code 127.
|
E2E Tests - examples
Process completed with exit code 127.
|