Skip to content

Draft: [FLINK-36061] Support Iceberg CDC Pipeline SinkV2 #393

Draft: [FLINK-36061] Support Iceberg CDC Pipeline SinkV2

Draft: [FLINK-36061] Support Iceberg CDC Pipeline SinkV2 #393

Triggered via pull request February 1, 2025 05:23
Status Cancelled
Total duration 8m 3s
Artifacts

flink_cdc_ci.yml

on: pull_request
Matrix: Migration Tests / data_stream_migration_test
Matrix: Migration Tests / migration_test_ut
Matrix: Migration Tests / pipeline_migration_test
Matrix: pipeline_e2e
Matrix: Source E2E Tests / compile_and_test
Matrix: Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

41 errors
Migration Tests / migration_test_ut (8, 1.20.0)
Process completed with exit code 1.
Migration Tests / migration_test_ut (8, 1.19.1)
The job was canceled because "_8_1_20_0" failed.
Migration Tests / migration_test_ut (8, 1.19.1)
The operation was canceled.
Unit Tests (oracle) / compile_and_test (8, generic)
Process completed with exit code 1.
Unit Tests (postgres) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (postgres) / compile_and_test (8, generic)
Process completed with exit code 1.
Pipeline E2E Tests (4-Parallelism) / compile_and_test (8, 1.20.0)
Process completed with exit code 1.
Unit Tests (vitess) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (vitess) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (tidb) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (tidb) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (core) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (core) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (oceanbase) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (oceanbase) / compile_and_test (8, generic)
The operation was canceled.
Source E2E Tests / compile_and_test (8, 1.19.1)
Process completed with exit code 1.
Pipeline E2E Tests (1-Parallelism) / compile_and_test (8, 1.19.1)
Process completed with exit code 1.
Unit Tests (db2) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (db2) / compile_and_test (8, generic)
The operation was canceled.
Pipeline E2E Tests (1-Parallelism) / compile_and_test (8, 1.20.0)
Process completed with exit code 1.
Unit Tests (pipeline_connectors) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (pipeline_connectors) / compile_and_test (8, generic)
The operation was canceled.
Pipeline E2E Tests (4-Parallelism) / compile_and_test (8, 1.19.1)
The job was canceled because "_8_1_20_0" failed.
Pipeline E2E Tests (4-Parallelism) / compile_and_test (8, 1.19.1)
The operation was canceled.
Unit Tests (mongodb6) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (mongodb6) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (mongodb7) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (mongodb7) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (sqlserver) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (sqlserver) / compile_and_test (8, generic)
The operation was canceled.
Unit Tests (mysql) / compile_and_test (8, generic)
FailFast: cancelling since parallel instance has failed
Unit Tests (mysql) / compile_and_test (8, generic)
The operation was canceled.
Source E2E Tests / compile_and_test (8, 1.20.0)
The job was canceled because "_8_1_19_1" failed.
Source E2E Tests / compile_and_test (8, 1.20.0)
The operation was canceled.
Migration Tests / pipeline_migration_test (8, 1.20.0)
Process completed with exit code 1.
Migration Tests / pipeline_migration_test (8, 1.19.1)
The job was canceled because "_8_1_20_0" failed.
Migration Tests / pipeline_migration_test (8, 1.19.1)
The operation was canceled.
License Check
Process completed with exit code 1.
Migration Tests / data_stream_migration_test (8, 1.19.1)
Process completed with exit code 1.
Migration Tests / data_stream_migration_test (8, 1.20.0)
The job was canceled because "_8_1_19_1" failed.
Migration Tests / data_stream_migration_test (8, 1.20.0)
The operation was canceled.