chore(deps): update dependency go to v1.23.1 #29
test.yml
on: pull_request
Lint, test, build and test-e2e with KinD
2m 57s
Annotations
2 errors
Lint, test, build and test-e2e with KinD
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Lint, test, build and test-e2e with KinD
The operation was canceled.
|