Skip to content

fix: fixes integration with latest sd-switch. #60

fix: fixes integration with latest sd-switch.

fix: fixes integration with latest sd-switch. #60

Triggered via push December 20, 2024 22:49
Status Failure
Total duration 4m 22s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
test (x86_64-linux, nixos-24.11, release-24.11)
Process completed with exit code 1.
test (x86_64-linux, nixos-unstable, master)
The job was canceled because "x86_64-linux_nixos-24_11_" failed.
test (x86_64-linux, nixos-unstable, master)
The operation was canceled.
test (x86_64-linux, nixos-24.11, release-24.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636