Skip to content

Add ceres

Add ceres #14

Triggered via push October 22, 2024 01:46
Status Cancelled
Total duration 7m 48s
Artifacts

bazel.yml

on: push
buildifier
27s
buildifier
Matrix: build-linux
Matrix: build-mac
Matrix: build-sanitizers
Matrix: build-windows
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 1 warning
Build Windows (roborio)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Build Windows (roborio)
The operation was canceled.
Build Windows (native)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Build Windows (native)
The operation was canceled.
Build Windows (arm)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Build Windows (arm)
The operation was canceled.
Linux (native)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Linux (native)
The operation was canceled.
Sanitizer asan
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Sanitizer asan
The operation was canceled.
Sanitizer ubsan
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Sanitizer ubsan
The operation was canceled.
Mac (native)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Mac (native)
The operation was canceled.
Mac (roborio)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Mac (roborio)
The operation was canceled.
Linux (roborio)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/mrcal' exists
Linux (roborio)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
buildifier
Restore cache failed: Dependencies file is not found in /home/runner/work/allwpilib/allwpilib. Supported file pattern: go.sum