Skip to content

mapper: provenance before check for ignore #70

mapper: provenance before check for ignore

mapper: provenance before check for ignore #70

Triggered via push December 18, 2024 15:49
Status Failure
Total duration 36s
Artifacts

integration.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (3.9)
Process completed with exit code 1.
build (3.8)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.
build (3.12)
The job was canceled because "_3_9" failed.
build (3.12)
The operation was canceled.