Skip to content

Update crust with the callisto #5939

Update crust with the callisto

Update crust with the callisto #5939

Triggered via pull request December 23, 2024 13:06
Status Failure
Total duration 1h 5m 4s
Artifacts

ci.yml

on: pull_request
Matrix: ci
Fit to window
Zoom out
Zoom in

Annotations

3 errors
ci (lint)
Process completed with exit code 2.
ci (integration tests coreum-upgrade-v4.0.0)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
ci (integration tests coreum-upgrade-v4.0.0)
The self-hosted runner: gh-runner-vm-89kg lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.