Skip to content

Upgrade code base

Upgrade code base #401

Triggered via pull request January 11, 2024 13:46
Status Failure
Total duration 1m 5s
Artifacts

ci_tests.yml

on: pull_request
External  /  Run `pre-commit`
55s
External / Run `pre-commit`
External  /  Run `pylint` & `safety`
30s
External / Run `pylint` & `safety`
External  /  Build distribution package
19s
External / Build distribution package
External  /  Build Documentation
28s
External / Build Documentation
pytest
23s
pytest
Matrix: as-pre-commit-hook
Fit to window
Zoom out
Zoom in

Annotations

8 errors
As a pre-commit hook (pre-commit ==1.13.0)
Process completed with exit code 1.
As a pre-commit hook (pre-commit ~=1.0)
The job was canceled because "_1_13_0" failed.
As a pre-commit hook (pre-commit ~=1.0)
The operation was canceled.
As a pre-commit hook (pre-commit ~=3.0)
The job was canceled because "_1_13_0" failed.
As a pre-commit hook (pre-commit ~=3.0)
The operation was canceled.
As a pre-commit hook (pre-commit ~=2.0)
The job was canceled because "_1_13_0" failed.
As a pre-commit hook (pre-commit ~=2.0)
The operation was canceled.
pytest
Process completed with exit code 2.