Skip to content

Merge: Release 0.10.0 (#332) #171

Merge: Release 0.10.0 (#332)

Merge: Release 0.10.0 (#332) #171

Triggered via push August 8, 2024 12:18
Status Cancelled
Total duration 7m 51s
Artifacts

ci.yml

on: push
Matrix: lint
Changelog
0s
Changelog
Reminder
4s
Reminder
Matrix: audit
Matrix: typecheck
Matrix: coretest
Matrix: fulltest
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build Docs
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Build Docs
The operation was canceled.
Full Tests 3.12
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Full Tests 3.12
The operation was canceled.
Full Tests 3.10
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Full Tests 3.10
The operation was canceled.
Core Tests 3.10
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Core Tests 3.10
The operation was canceled.