Version: 0.0.2
The mitigation of consequences reduces the risk after an event has occurred. Therefore, this risk reduction measure is not suitable for the reduction of the likelihood of events but for the reduction of the negative consequences. Examples for consequence mitigation measures could be e.g. the construction of connection pipes to the neighbor water supplier(s) to get water from them in case of a breakdown of the own water supply, the construction of wells for an emergency supply or signing of contracts with organizations providing small mobile emergency water treatment plants.
Link to the interactive specification
Link to the specification
Enlace a la Especificación en español
Lien vers le spécification en français
Link zur deutschen Spezifikation
Link alla specifica
Link to the example (keyvalues) for NGSI v2
Link to the example (keyvalues) for NGSI-LD
Link to the example (normalized) for NGSI-V2
Link to the example (normalized) for NGSI-LD
Link to the example (geojson feature) for NGSI-LD
Link to the example (keyvalues) for NGSI v2 in CSV format
Link to the example (keyvalues) for NGSI-LD in CSV format
Link to the example (normalized) for NGSI-V2 in CSV format
Link to the example (normalized) for NGSI-LD in CSV format
Link to the Generator of NGSI-LD normalized payloads compliant with this data model. Refresh for new values
Link to the Generator of NGSI-LD keyvalues payloads compliant with this data model. Refresh for new values
Link to the Generator of geojson feature format payloads compliant with this data model. Refresh for new values
Link to the PostgreSQL schema of this data model
If you have any issue on this data model you can raise an issue or contribute with a PR
If you wish to develop your own data model you can start from contribution manual. Several services have been developed to help with:
- Test data model repository including the schema and example payloads, etc
- Generate PostgreSQL schema to help create a table, create type, etc