Skip to content

Stabilising chop lemmas #10398

Stabilising chop lemmas

Stabilising chop lemmas #10398

Triggered via pull request September 9, 2024 12:36
Status Cancelled
Total duration 2m 58s
Artifacts

test-pr.yml

on: pull_request
Code Quality Checks
30s
Code Quality Checks
Matrix: Nix
Matrix: test-prove
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
Proofs: Functional
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Proofs: Rules (booster)
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Proofs: Rules (booster-dev)
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Proofs: Optimizations
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Conformance Tests
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Conformance Tests
The operation was canceled.
Conformance Tests
Process completed with exit code 1.
Nix (normal)
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Nix (normal)
The operation was canceled.
Proofs: DSS
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Proofs: DSS
The operation was canceled.
Nix (macos-13)
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Nix (macos-13)
The operation was canceled.
Nix (ARM64)
Canceling since a higher priority waiting request for 'Test PR-refs/pull/2613/merge' exists
Nix (ARM64)
The operation was canceled.
Nix (macos-13)
No push credentials found. Ignoring the 'useDaemon' option.