Support target-interval for operations #191
Labels
enhancement
Improves the status quo
:Track Management
New operations, changes in the track format, track download changes and the like
:Usability
Makes Rally easier to use
Milestone
When rate limiting operations it is currently possible to specify this through the "target-throughput" parameter. While this supports most scenarios, it is a bit cumbersome to use when you want to configure something to happen every X seconds as you have to calculate a decimal value that approximates this. Examples of this are simulating periodic scan and scroll jobs or very heavy queries.
For this type of scenarios it would be useful to be able to specify the "target-interval" in seconds instead of the throughput.
The text was updated successfully, but these errors were encountered: