Testing/manager #568
push-pr_workflow.yml
on: pull_request
CHANGELOG.md updated
4s
Lint
27s
Matrix: Integration-tests
Matrix: Local-test-suite
Matrix: Unit-tests
Annotations
19 errors
Lint
Process completed with exit code 1.
|
Integration-tests (3.7)
Process completed with exit code 4.
|
Integration-tests (3.8)
The job was canceled because "_3_7" failed.
|
Integration-tests (3.8)
The operation was canceled.
|
Integration-tests (3.9)
The job was canceled because "_3_7" failed.
|
Integration-tests (3.9)
The operation was canceled.
|
Integration-tests (3.11)
The job was canceled because "_3_7" failed.
|
Integration-tests (3.11)
The operation was canceled.
|
Integration-tests (3.10)
The job was canceled because "_3_7" failed.
|
Integration-tests (3.10)
The operation was canceled.
|
Unit-tests (3.7)
Process completed with exit code 4.
|
Unit-tests (3.8)
The job was canceled because "_3_7" failed.
|
Unit-tests (3.8)
The operation was canceled.
|
Unit-tests (3.11)
The job was canceled because "_3_7" failed.
|
Unit-tests (3.11)
The operation was canceled.
|
Unit-tests (3.10)
The job was canceled because "_3_7" failed.
|
Unit-tests (3.10)
The operation was canceled.
|
Unit-tests (3.9)
The job was canceled because "_3_7" failed.
|
Unit-tests (3.9)
The operation was canceled.
|