Add PR check to require an assigned milestone prior to merging #5683
Labels
Infrastructure
Changes impacting testing infrastructure or build tooling
WS:Core
Work stream for Plugin core
Feature description
One of the suggestions in #2741 is:
This would not work so well for us because we'll have the next major milestone (x.y) along with the next minor milestone (x.y.z) that we need to decide between. Therefore, the most important thing is that a milestone needs to be specified. So a new check could be introduced that blocks merging of a PR until a milestone is assigned.
Do not alter or remove anything below. The following sections will be managed by moderators only.
Acceptance criteria
Implementation brief
QA testing instructions
Demo
Changelog entry
The text was updated successfully, but these errors were encountered: