Skip to content

Meeting notes

Tanja Yakovenko edited this page May 12, 2024 · 34 revisions

Kick-Off meeting with industry partner 16.04

Goal: Participants:

Keep in mind *

To-Do 1.

1. Team meeting 17.04

Goal: Participants:

Keep in mind *

To-Do 1.

2. Team meeting 24.04

Goal: Participants:

Keep in mind *

To-Do 1.

All-Hands meeting 3.05

Goal: Participants:

FE refinement 3.05

Goal: Discuss FE concepts based on previously created requirements: (https://docs.google.com/document/d/1Y8mXNuit3eA8AI3zsE1gk8xR9Givt_Uvndifn5rclHE/edit#heading=h.nyheprkbuwq0) Participants: Oli, Celine, Lucas, Emil

FE team concept

image

PO concept

image

Keep in mind

  • Open apis / external apis (for routes, satellite images, etc)
  • Accessibility
  • 3D view constraints

To-Do

  1. Clarify scope with IP
  2. Clarify priority with IP
  3. Simplify FE concept for presenting, getting started, prioritizing

Simplified version by Oli

This should be the basis of what will be implemented in the upcoming sprint(s), may be refined after meeting with IP

Draft for presenting to IP

image

Draft for presenting to IP

For beginning of the implementation, Oli split it into 2 different view:

image

3. Team meeting 8.05

Goal: Participants:

Keep in mind *

To-Do 1.

FE refinement 8.05

Goal: Create and assign ticket for Sprint 2 for frontend vertical Participants: Tanja, Emil, Celine and Lucas

What we will need to implement (UI perspective)

  1. Basic layout a. Header b. Left-side (multimap) c. Right-side (data view)
  2. Multimap component (keeps track of zoom, location) a. TabController Component b. Map Component c. Pop-up for add. Map Views -> Pop-up Container necessary d. 3D View
  3. Load data component (=”arrow”) a. After selecting a location on the map user needs to click this button to load the data into the data view component.
  4. DataView Component a. Favorite Component b. SearchBar Component c. KeyValues Component (x3) i. Hover effect - popup component - question about loading specific dataset

Keep in mind

  • Check integration for material ui (add as a subtask to multimap)
  • The task “Popup Map Selection” P2 2 (Lucas) is going to the future sprint

To-Do

  1. PO will create tickets on the feature board and assign them to team members
  2. PO will create tickets for future sprints

4. Team meeting 15.05