Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Double Counting of Green Roof Drainage Mat Final and Initial Volume #102

Closed
dickinsonre opened this issue Dec 17, 2022 · 1 comment
Closed

Comments

@dickinsonre
Copy link

dickinsonre commented Dec 17, 2022

As discussed on OpenSWMM.ORG https://www.openswmm.org/Topic/32892/initial-storage-by-lid-summary-results the three layer Green Roof of SWMM5 seems to count the volume in the lower layer or Drainage Mat Twice.

In the attached file the drainage mat is 100 mm, the void fraction is 0.5 and the percent saturated is 50 percent. The initial storage should be 100 * 0.5 * 0.5 or 25 mm. It is listed as 50 mm as the storage depth is set equal to drainage mat depth as explained on OpenSWMM

SWMM_Erica Orsi.inp.txt

the value for initial and final storage of the Green Roof should not include the Drainage Mat twice.

@michaeltryby
Copy link
Collaborator

Closed in Release v5.2.3

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

No branches or pull requests

2 participants