-
Notifications
You must be signed in to change notification settings - Fork 1
Installation (Bahmni 0.89)
Anant Raut edited this page Jul 4, 2017
·
1 revision
Note: This is based on a blue-green deployment configuration.
- Take the backup of the current preprod database and config files
- To enable offline installation, make sure to enable to yum cache (refer https://bahmni.atlassian.net/wiki/display/BAH/Bahmni+Installation+Without+Internet) so that the downloaded packages can be used when offline
- "Install the Bahmni on preprod by following the steps mentioned here https://bahmni.atlassian.net/wiki/pages/viewpage.action?pageId=35291242
- Make sure to mention the IP address in the inventory file (not the current prod IP), instead of ""localhost"". Also make sure to copy the right config into deployment-artifacts"
- Check whether all the applications are up and running (MRS, ELIS, ERP, PACS, Reports)
- "Check if the sync between applications are working fine.
- Make sure the markers tables has the right IP address mentioned in the entries"
- Check for the sanity on all applications
- Make sure the custom erp module for Possible is added in OpenERP. Also make sure the "assets" module is setup properly
- Conduc UAT on it