You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Jun 11, 2024. It is now read-only.
When the network is behind on certificating new height, the validator nodes should keep the commits for the height which must be certified. (ie: the one height before the BFT parameter change are made is required)
Actual behavior
Some validator loses the commit created and due to that, the network won't be able to catch up with certification
Steps to reproduce
Observe lisk-core testnet which runs 6.0.0-rc.2 SDK
Which version(s) does this affect? (Environment, OS, etc...)
6.0.0-rc.2
The text was updated successfully, but these errors were encountered:
Expected behavior
When the network is behind on certificating new height, the validator nodes should keep the commits for the height which must be certified. (ie: the one height before the BFT parameter change are made is required)
Actual behavior
Some validator loses the commit created and due to that, the network won't be able to catch up with certification
Steps to reproduce
Observe lisk-core testnet which runs 6.0.0-rc.2 SDK
Which version(s) does this affect? (Environment, OS, etc...)
6.0.0-rc.2
The text was updated successfully, but these errors were encountered: